Skip to content.

Release date: August 1, 2011

*** Press Release ***

The San Francisco Municipal Transportation Agency (SFMTA), which oversees all surface transportation in the City, including the Municipal Railway (Muni), today announced that, effective Thursday, Aug. 4, McAllister Street east of Hyde Street will be reconfigured. Also, Charles J. Brenham Place (7th Street north of Market) will be converted to two-way. The traffic reconfiguration and correlated completion of the overhead contact system (OCS) rehabilitation in this area mean that the nearly 16,000 annual 5 Fulton Muni trolley bus customers will now have a more direct trip downtown. The change will save the Agency more than $200,000 a year in operating expenses.

Effective Aug. 4, the new configuration will allow Muni, commercial vehicles and bicycles to travel eastbound on McAllister Street between Hyde Street and Charles J. Brenham Place. All other eastbound McAllister traffic will continue to turn right at Hyde Street. Only bicycles, taxis and Muni vehicles will be allowed to turn east on Market Street from McAllister Street. All other traffic will be required to turn right onto Market Street. All traffic will be able to make a right turn from northbound Charles J. Brenham Place (7th Street north of Market Street) onto eastbound McAllister Street to access the block between Charles J. Brenham Place and Jones Street. The attached maps show the changes in the traffic configuration.

The current 5 Fulton route requires inbound vehicles heading downtown to make a right on Hyde Street and then a left on Market Street. The new route, made possible by new overhead wires in the eastbound direction, will allow buses on this route to go straight to Market Street, saving up to three minutes per trip. The changes to the 5 Fulton route will take effect after the testing of the new OCS in August.

The SFMTA’s Capital Investment Program includes the rehabilitation of the aging trolley bus OCS in various parts of the City. This vital work includes replacing existing poles and overhead wires. Rehabilitation of the OCS improves safety and service reliability and helps keeps Muni in a state of good repair. The OCS construction began last summer and was part of the 21 Hayes Pole Replacement project.

telephone311 Free language assistance / 免費語言協助 / Ayuda gratuita con el idioma / Бесплатная помощь переводчиков / Trợ giúp Thông dịch Miễn phí / Assistance linguistique gratuite / 無料の言語支援 / 무료 언어 지원 / Libreng tulong para sa wikang Tagalog / คว“มช่วยเหลือท“งภ“ษ“โดยไม่เส’ยค่าใช้จ่าย

 

©2000-2013 San Francisco Municipal Transportation Agency. All rights reserved.