This is the archival website for the San Francisco Municipal Transportation Agency (SFMTA). It is not kept up to date. Please visit the SFMTA website for current information. SFMTA West Portal Construction Starts Monday: Work to improve underground drainage at West Portal and 15th avenues |
Release date: 6/10/11 *** Press Release ***The San Francisco Municipal Transportation Agency (SFMTA), which oversees all surface transportation in the City, including the Municipal Railway (Muni), today announced that underground drainage work will begin Monday, June 13 and last approximately two weeks at West Portal and 15th avenues. Construction will take place on weekdays from 9 a.m. to 4:30 p.m. Traffic Impacts The following street closure will be required from 8 a.m. to 4:30 p.m., each construction day:
Through traffic on West Portal Avenue will detour south on 15th Avenue to Portola Drive and back to Sloat Boulevard. Local access for businesses and residents on West Portal Avenue will be maintained. During construction, flaggers will be on site to monitor and assist with traffic flow. Transit Impacts No Muni routes or lines will be affected. This final piece of work is needed to resolvea drainageissuethat arose at West Portal and 15thavenues related to the light rail vehicle track installed during last summer’s St. Francis Circle Rail Replacement Project. For more information about the Saint Francis Rail Replacement Project, please visit www.sfmta.com/stfranciscircle or call 311. |
311 Free language assistance / 免費語言協助 / Ayuda gratuita con el idioma / Бесплатная помощь переводчиков / Trợ giúp Thông dịch Miễn phí / Assistance linguistique gratuite / 無料の言語支援 / 무료 언어 지원 / Libreng tulong para sa wikang Tagalog / คว“มช่วยเหลือท“งภ“ษ“โดยไม่เส’ยค่าใช้จ่าย
©2000-2013 San Francisco Municipal Transportation Agency. All rights reserved. |