Skip to content.

The Director of Parking and Traffic will hold a public hearing on Friday, May 15, 2009, at10:00 AM, in Room 416 (Hearing Room 4), City Hall, 1 Dr. Carlton B. Goodlett Place, SanFrancisco, CA  94102, to consider the following proposals:

Tow-Away No Stopping Anytime - ESTABLISH

            Hyde Street, west side, from Lombard Street to 20 feet northerly;

            Hyde Street,   west side, from Pacific Avenue to 20 feet northerly;

            Jackson Street, north and south sides, from Jones Street to 20 feet easterly;

            Jackson Street, north side, from Taylor Street to 20 feet easterly;

  Mason Street, west side, from Pacific Avenue to 15 feet northerly;

            Mason Street, west side, from Green Street to 20 feet northerly.

10-MINUTE GREEN ZONE, 9 AM TO 6 PM, MONDAY THROUGH SATURDAY - RESCIND

            Hyde Street, west side, from Pacific Avenue to 20 feet northerly.

No Parking Vehicles Over 6 Feet High - RESCIND

            Jackson Street, north side, from Taylor Street to 20 feet easterly.

    10-MINUTE GREEN ZONE, 9 AM TO 6 PM, MONDAY THROUGH SATURDAY - ESTABLISH

            Mason Street, west side, from 20 feet north of Green Street to 16 feet northerly.

MOTORCYCLE PARKING - ESTABLISH

            McAllister Street, north side, from 42 feet west of Leavenworth Street to 63 feet westerly (establishes 6 motorcycle parking spaces at 3 feet, 6 inches each).

YELLOW ZONE – REVOKE

            McAllister Street, south side, from 24 feet to 48 feet west of Jones Street.

YELLOW ZONE – ESTABLISH

            McAllister Street, south side, from 4 feet to 32 feet west of Jones Street.

WHITE ZONE - REVOKE

            McAllister Street, south side, from 4 feet to 66 feet east of Charles J. Brenham Place (north of 7th Street).

WHITE ZONE - ESTABLISH

            McAllister Street, south side, from 20 feet to 82 feet east of Charles J. Brenham Place (north of 7th Street).

RED ZONE - ESTABLISH

            McAllister Street, south side, from Charles J. Brenham Place to 20 feet easterly;

            28th Street, south side, from Castro Street to 20 feet easterly.

RED ZONE – EXTEND

            Broadway Service Road, north side, from 145 feet east of Mason Street to
25 feet westerly.

MULTIPLE RIGHT TURN LANES – RESCIND

            Sutter Street, westbound, at Stockton Street.

            (This is being done in conjunction with DPW’s request to modify Pedestrian Island.)
    SIDEWALK BULB-OUTS - INSTALL

            Sutter Street, south side, from Jones Street to 22 feet easterly;

            (6 feet wide sidewalk bulb-out, eliminating parking meter space # 745)

                Jones Street, east side, from Eddy Street to 20 feet southerly;

            (6 feet wide sidewalk bulb-out, eliminating parking meter space # 230)

            Eddy Street, north side, from Jones Street to 23 feet easterly (expands existing 3-feet wide bulb-out by an additional 3 feet for a total of 6 feet).

METERED MOTORCYCLE PARKING – ESTABLISH

            Market Street, north side, from 337 feet west of Church Street to 358 feet       westerly (establishes 6 metered motorcycle parking spaces, replacing parking meter space # 2130).

Tow-Away No Stopping, Thursday 10 PM to Friday 3 AM, Friday 10 PM to Saturday 3 AM, Saturday 10 PM to Sunday 3 AM - ESTABLISH

            Stillman Street, both sides, between 3rd and 4th Streets (100 Block).

RESIDENTIAL PERMIT PARKING AREA "I" (1-HOUR TIME LIMIT, 9 AM - 6 PM, MONDAY THROUGH SATURDAY) - ESTABLISH

            2749 Mission Street, between 23rd and 24th Streets (includes specific address only; signs will not be posted on the street, but residents will be eligible for a permits).

RESIDENTIAL PERMIT PARKING AREA "V" (2-HOUR TIME LIMIT, 8 AM - 6 PM, MONDAY THROUGH FRIDAY) - ESTABLISH

            Ocean Avenue, north side, between Granada and Plymouth Avenues (includes          the 1300 block, even numbers only; signs will not be posted on the street, but    businesses will be eligible for permits).

Alemany boulevard bicycle project

            CLASS II BICYCLE LANE – ESTABLISH

            Alemany Boulevard, eastbound, from Rousseau Street to Putnam Street;

            Alemany Boulevard, westbound, from 190 feet east of Putnam Street to          Rousseau Street, and also to Justin Drive;

            Justin Drive, southbound, from westbound Alemany Boulevard to eastbound Alemany Boulevard eastbound.

            TOW AWAY NO STOPPING ANYTIME – ESTABLISH

            Alemany Boulevard, westbound, north side, from 120 feet west of Ellsworth Street to Justin Drive;

            Alemany Boulevard, eastbound, south side, from Congdon Street to Putnam Street.

            RIGHT LANE MUST TURN RIGHT – ESTABLISH

            Alemany Boulevard, eastbound, approaching Congdon Street;

            Alemany Boulevard, eastbound, approaching Trumbull Street.

            BUS ZONE - ESTABLISH

           Alemany Boulevard, westbound, north side, from 300 feet to 400 feet west of Ellsworth Street (mid-block);

            Alemany Boulevard, westbound, north side, from Folsom Street to 80 feet westerly (far side, northwest corner).

Scott street bicycle project

            CLASS II BICYCLE LANE – ESTABLISH

            Scott Street, northbound left-turn lane, from Oak Street to Fell Street.

Bayshore boulevard bicycle project

            CLASS II BICYCLE LANE – ESTABLISH

            Bayshore Boulevard, northbound, from Silver Avenue to Oakdale Avenue;

            Bayshore Boulevard, northbound, from Jerrold Avenue to Marin Street;

            Bayshore Boulevard, southbound, Oakdale Avenue to Silver Avenue.

            CLASS III BICYCLE ROUTE – ESTABLISH

            Loomis Street, northbound, from Oakdale Avenue to Barneveld/McKinnon      Avenues;

            Barneveld Avenue, northbound, from Loomis Street/McKinnon Avenue to Jerrold       Avenue;

            Jerrold Avenue, westbound, from Barneveld Avenue to Bayshore Boulevard.

            TOW AWAY NO STOPPING ANYTIME – ESTABLISH

            Bayshore Boulevard, east side, between Jerrold Street and Marin Street;      

            Bayshore Boulevard, west side, between Hilton Street and Silver Avenue;     

            Bayshore Boulevard, east side, from 140 feet north of Silver Avenue to Helena Street.

RIGHT LANE MUST TURN RIGHT EXCEPT FOR MUNI AND BICYCLES – ESTABLISH

            Bayshore Boulevard, northbound, from Helena Street to Marengo Street.

OCEAN AVENUE bicycle project

            CLASS II BICYCLE LANE – ESTABLISH

            Ocean Avenue, eastbound, from Lee Avenue to Harold Avenue;

            Ocean Avenue, eastbound, from Geneva Avenue to Howth Street;

            Ocean Avenue, eastbound, from Cayuga Avenue to Alemany Boulevard;

            Ocean Avenue, westbound, from Cayuga Avenue to approximately 115 feet east      of I-280 off-ramp.

            TOW AWAY NO STOPPING ANYTIME – ESTABLISH

            Ocean Avenue, south side, between Lee Avenue and Harold Avenue;

            Ocean Avenue, north side, from San Jose Avenue to 150 feet easterly;

            Ocean Avenue, north side, from I-280 on-ramp to 200 feet easterly;

            Ocean Avenue, south side, from Geneva Avenue to 135 feet easterly.

            LEFT LANE MUST TURN LEFT EXCEPT FOR MUNI - ESTABLISH

            Ocean Avenue, eastbound, at Phelan Avenue.

laguna honda boulevard bicycle project

            CLASS II BICYCLE LANE – ESTABLISH

            Laguna Honda Boulevard, southbound, from Merced Avenue to Vasquez        Avenue.

            CLASS III BICYCLE ROUTE – ESTABLISH

            Laguna Honda Boulevard, northbound, from Vasquez Avenue to Woodside    Avenue.

            TOW AWAY NO STOPPING ANYTIME – ESTABLISH

            Laguna Honda Boulevard, west side, between Merced Avenue and Vasquez Avenue.

GREAt highway and point lobos avenue bicycle project

            CLASS II BICYCLE LANE - ESTABLISH

                Great Highway and Point Lobos Avenue, northbound and eastbound, from     Fulton Street to 48th Avenue;

            Point Lobos Avenue, westbound, from El Camino Del Mar to approximately 725       feet westerly (at entrance to parking lot on south side of street);

            Great Highway, southbound, from approximately 575 feet north of Balboa Street        (at entrance to parking lot on west side of street) to Balboa Street.

            CLASS III BICYCLE ROUTE – ESTABLISH

            Balboa Street, both directions, between Great Highway and La Playa Street;

            La Playa Street, both directions, between Balboa Street and Cabrillo Street.

            RIGHT LANE MUST TURN RIGHT – ESTABLISH

            Point Lobos Avenue, westbound, at El Camino Del Mar.

            BUS ZONE - ESTABLISH

              Point Lobos Avenue, north side, from El Camino Del Mar to 80 feet westerly (far       side, northwest corner).

Potrero avenue bicycle project

            CLASS II BICYCLE LANE – ESTABLISH

            Potrero Avenue, northbound, from intersection of Potrero Avenue and US 101           off-ramp to approximately 300 feet south of 25th Street (at start of existing bicycle lane).

            TOW AWAY NO STOPPING ANYTIME – ESTABLISH

            Potrero Avenue, east side, from intersection of Potrero Avenue and US 101 off-        ramp to approximately 300 feet south of 25th Street (at start of existing bicycle             lane).
portola drive bicycle project

CLASS II BICYCLE LANE – ESTABLISH

           Portola Drive, both directions, between Corbett Avenue and O’Shaughnessy             Boulevard/Woodside Avenue.

TOW AWAY NO STOPPING ANYTIME – ESTABLISH

            Portola Drive, north side, from 170 feet to 250 feet west of Corbett Avenue;

            Portola Drive, westbound, from 60 feet to 120 feet east of Woodside Avenue.

RIGHT LANE MUST TURN RIGHT – ESTABLISH

            Portola Drive, westbound, approaching Woodside Avenue.

BUS ZONE – ESTABLISH

            Portola Drive, south side, from 575 feet to 625 feet east of O’Shaughnessy    Boulevard (mid-block);

            Portola Drive, south side, from Glenview Drive to 80 feet easterly (far side,     southeast corner);

            Portola Drive, north side, form the east end of the driveway of 110 Portola Drive        to 80 feet easterly (mid-block);

            Portola Drive, north side, from Burnett Avenue to 80 feet westerly (far side,     northwest corner);

            Portola Drive, north side, from Glenview Drive to 80 feet westerly (far side,     northwest corner).

john muir drive bicycle project

            CLASS II BICYCLE LANE – ESTABLISH

            John Muir Drive, both directions, between Lake Merced Boulevard and Skyline Boulevard.

            DIAGONAL (45-DEGREE ANGLE) PARKING – RESCIND

            John Muir Drive, south side, from 300 feet to 3000 feet east of Skyline Boulevard (2700- foot zone).

            DIAGONAL (BACK-IN 45-DEGREE ANGLE) PARKING – ESTABLISH

            John Muir Drive, south side, from 300 feet to 3000 feet east of Skyline Boulevard (2700- foot zone).

telephone311 Free language assistance / 免費語言協助 / Ayuda gratuita con el idioma / Бесплатная помощь переводчиков / Trợ giúp Thông dịch Miễn phí / Assistance linguistique gratuite / 無料の言語支援 / 무료 언어 지원 / Libreng tulong para sa wikang Tagalog / คว“มช่วยเหลือท“งภ“ษ“โดยไม่เส’ยค่าใช้จ่าย

 

©2000-2013 San Francisco Municipal Transportation Agency. All rights reserved.