This is the archival website for the San Francisco Municipal Transportation Agency (SFMTA). It is not kept up to date. Please visit the SFMTA website for current information. Engineering Hearings > March 18, 2011, Hearing Notice |
Agenda
CITY and COUNTY of SAN FRANCISCO SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Order # 3881 Director of Transportation Engineering – Sustainable Streets Division will hold a public hearing on Friday, March 18, 2011, at 10:00 AM, in Room 416 (Hearing Room 4), City Hall, 1 Dr. Carlton B. Goodlett Place, San Francisco, CA 94102, to consider the following proposals: ESTABLISH – NO PARKING VEHICLES OF SIX FEET OR MORE IN HEIGHT Mendell Street, both sides, from Hudson to Galvez Avenue ESTABLISH – TOW-AWAY, NO PARKING, 10 PM TO 6 AM, EVERYDAY Mendell Street, both sides, between Fairfax and Galvez Avenues Galvez Avenue, both sides, between Mendell and Newhall Streets
ESTABLISH – NO PARKING ANYTIME Bayshore Boulevard, west side, from Blanken Avenue, 69 feet to 134 feet northerly (65 foot zone) ESTABLISH – TOW-AWAY NO STOPPING ANYTIME Bayshore Boulevard, west side, from Blanken Avenue, 59 feet to 69 feet northerly (10 foot zone) RESCIND – 4-HOUR PARKING, 7 AM TO 6 PM, MONDAY THROUGH FRIDAY ESTABLISH – RESIDENTIAL PERMIT PARKING AREA X, 4-HOUR PARKING, 7 AM TO 6 PM, MONDAY THROUGH FRIDAY Pennsylvania Avenue, both sides, between 23rd Street and the I-280 off-ramp ESTABLISH – STOP SIGNS Northbound Ord Street at Ord Court and Eastbound Ord Court at Ord Street (stops two of the approaches of this three-legged intersection to improve right-of-way) ESTABLISH – UNMETERED MOTORCYCLE PARKING Tehama Street, north side, from 9th Street, 249 to 259 feet easterly (10 foot zone) outside 750 Tehama (Residential Parking Permit Regulations to Remain) EXTEND – RESIDENTIAL PERMIT PARKING AREA X, 8 AM TO 6 PM, 2-HOUR LIMIT, MONDAY THROUGH FRIDAY 224 Mississippi Street, west side, from 125 feet to 100 feet south of Mariposa Street ESTABLISH – YIELD SIGN Masonic Avenue southbound frontage road, between Geary Blvd. and Anza Street REVOKE – BLUE ZONE 250 Valencia Street, west side, from 117 feet to 139 feet south of Clinton Park (22-foot long) ESTABLISH – PART-TIME PASSENGER LOADING ZONE, 7:30AM TO 8:30AM, 2PM TO 6PM, SCHOOL DAYS RESCIND – BICYCLE LANE Ocean Avenue, eastbound, from Lee Avenue to Geneva Avenue ESTABLISH – PARKING METER AREA 3, 1-HOUR LIMIT, 9 AM TO 6 PM, MONDAY THROUGH SATURDAY Ocean Avenue, south side, from Lee Avenue to Harold Avenue ESTABLISH – YELLOW METER ZONE, 30-MINUTE LIMIT, 8 AM TO 6 PM, MONDAY THROUGH SATURDAY Ocean Avenue, south side, from 117 feet to 139 feet east of Lee Avenue RE-OPEN – CROSSWALK West crosswalk at the Intersection of Marina Street and Beach/Buchanan Streets, from island to NW corner ESTABLISH – RESIDENTIAL PERMIT PARKING AREA S, 2-HOUR LIMIT, 8 AM TO 9 PM, MONDAY THROUGH FRIDAY Divisadero Street, west side, between Haight and Page Streets (residential permit parking signage to be installed from Haight Street to 150 feet northerly, with parking meters on the remainder of the block; see below). ESTABLISH – PARKING METER AREA 3, 2-HOUR LIMIT, 9 AM TO 6 PM, MONDAY THROUGH SATURDAY Divisadero Street, west side, from Page Street to 125 feet southerly Divisadero Street, east side, from Page Street to 50 feet southerly Divisadero Street, east side, from 75 feet to 125 feet north of Haight Street AREA-WIDE TRAFFIC CALMING Silver Terrace neighborhood, bounded by Bayshore Boulevard, Silver Avenue, Palou Avenue, Williams Avenue and Phelps Street Community-developed traffic calming proposals for local streets within the project area. TRAFFIC CALMING – “HOME ZONE” PILOT Minna, Natoma, 15th, Capp and Adair Streets within the area bounded by 14th Street, South Van Ness Avenue, 16th Street and Mission Street Community-requested and developed traffic calming proposals to create a pilot “Home Zone” in this two square block area near the 16th Street BART Station. Phase 1 Projects Minna Street Phase 1:
Natoma Street Phase 1:
Capp Street Phase 1:
Phase 2 Projects Minna and Natoma Streets Phase 2:
15th Street Phase 2:
Capp Street Phase 2:
Adair Street Phase 2:
Phase 3 Projects Minna, Natoma and Adair Streets Phase 3:
|
311 Free language assistance / 免費語言協助 / Ayuda gratuita con el idioma / Бесплатная помощь переводчиков / Trợ giúp Thông dịch Miễn phí / Assistance linguistique gratuite / 無料の言語支援 / 무료 언어 지원 / Libreng tulong para sa wikang Tagalog / คว“มช่วยเหลือท“งภ“ษ“โดยไม่เส’ยค่าใช้จ่าย
©2000-2013 San Francisco Municipal Transportation Agency. All rights reserved. |