This is the archival website for the San Francisco Municipal Transportation Agency (SFMTA). It is not kept up to date. Please visit the SFMTA website for current information. Transit Effectiveness Project (TEP) > Muni Rapid > J Church Proposals > J Church Proposal Details |
Proposed Traffic Signal and Stop Sign Changes Replace all-way STOP signs with a traffic signal (1 intersection)
Replace all-way STOP signs with a traffic signal (moderate proposal) or traffic calming measures (expanded proposal) (4 intersections)
Proposed Transit Stop Changes (both directions unless otherwise stated) Consistent stop spacing. Remove transit stops (3 stops at 2 intersections)
Optimize stop with transit boarding island/platform (5 stops at 4 intersections)
New transit bulbs (7 bulbs at 4 intersections)
Extend existing boarding islands to 80’ (2 islands at 2 intersections)
Lane Modifications (expanded proposal only) Transit-only lanes (1 location)
Parking and Turn Restrictions (expanded only) No left-turn restrictions (7a-7p, except Muni, NB and SB)
Install pedestrian bulbs (2 bulbs at 1 intersection)
Install crosswalk (1 crosswalk at 1 intersection)
|
©2000-2013 San Francisco Municipal Transportation Agency. All rights reserved. |